Installation
supervision
Engineering oversight of installation carried out by the client’s contractor: node checks, conformance to the design, deviation logs and acceptance of concealed works.
ТМОВиКЭОМ
Scope of work
- Stage 01
- Review of the design and installation schedule with the contractor
- Stage 02
- Site visits at control points
- Stage 03
- Concealed work certificates, deviation records
- Stage 04
- Final check before commissioning
Questions and answers
The answer, two or three sentences. Text to be provided by you.
The answer, two or three sentences. Text to be provided by you.